Hi all,
The Apertis team is committed to provide high quality standards and
therefore is always trying to improve the stability of the releases.
With this mindset we have decided to extend the RC testing period from
one week to two weeks for every release, in order to provide enough time
to run all the tests and propose proper fixes if needed.
Worth noting the dates for the final releases have not changed, but
instead the schedule was adjusted to accommodate the extended testing
period. Refer to [1], [2] and [3] for more details.
Thanks to everyone who contributed!
Walter
[1] https://www.apertis.org/release/v2021.5/release_schedule/
[2] https://www.apertis.org/release/v2022.1/release_schedule/
[3] https://www.apertis.org/release/v2023dev2/release_schedule/
--